我的联系人
拖链,chainflex® 高柔性电缆,电缆,定制系统,装配拖链

徐晓苓

+86 21 8036 6608
dry-tech® 轴承技术

王蕾

+86 21 8036 6949

Extreme dirt accumulation through road building materials

Sambo Heavy Ind., Korea

Industry: Road construction

e-chain®: 2x 48.075.100.0

Travel: 14 m

Speed: 1 m/s

Acceleration: 1 m/s2

Filling: 0.8 kg/m


An asphalt finisher applies hot and cold bitumen mixtures. The e-chain® supplies the front area of the vehicle and is exposed to extreme dirt.

Road construction  
More on applied products here
Further interesting applications from extremely diverse areas can be found here.